Contractors & Architects
Submittal-ready product data and lead times confirmed in writing
You are buying against a drawing and a deadline. What you need from a supplier is a submittal package that gets approved the first time, a lead time that holds, and a price that does not move between tender and delivery. What you do not need is marketing language.

The problem
What we hear most often
- 01
Submittals get rejected on incomplete data
Missing material grade, mounting detail or dimensional information turns a two-day approval into a three-week loop.
- 02
Lead times move after award
A stated lead time that turns out to be an estimate is a scheduling problem that lands on you, not the supplier.
- 03
Bike parking is a code item, not an extra
Toronto ICI and mid/high-rise projects carry bicycle parking requirements under Chapter 230 and the Toronto Green Standard. The line item exists whether or not it was priced properly at tender.
- 04
Specification conflicts get discovered late
A sheet that says stainless in the title and galvanized in the table costs somebody a week. We would rather resolve it before you submit.
How we work with you
- Dimensional data, material grade, finish and mounting detail on every product
- Lead time confirmed in writing at quotation, per line
- Submittal turnaround in 48 hours where we have the specification
- Direct answers on substitution requests and equivalence
- Supply-only delivery to site on your schedule, staged if required
- Clear statement of what we do not supply, so nothing is assumed
Products for this application
Worth knowing
- Relevant sections: 32 39 13 Manufactured Metal Bollards, 12 93 13 Bicycle Racks, 34 71 13 Vehicle Barriers
- 48-hour submittal turnaround where the specification is supplied
- Written lead times, per line, at quotation
Questions we get asked
Do you have CAD and Revit files?
Dimensional data and mounting details are available now on the product spec sheets. CAD, Revit families and three-part CSI specifications are in production, if you need a specific file for a live project, contact us and we will prioritise it.
How fast can you turn a submittal?
48 hours where we have the specification section and the schedule. Send the relevant pages and we will confirm compliance, note any deviation honestly, and give you lead time in writing.
Are your bike racks compliant with Toronto requirements?
Our racks meet the standard two-point-contact, U-lock-compatible configuration expected for short-term bicycle parking. Compliance also depends on placement: short-term spaces need to be at grade, publicly accessible, and within 30 metres of a pedestrian entrance. We are glad to review the layout with you.
Do you self-perform installation?
No. We supply, and we coordinate installation through partners where a client wants a single number. On contractor-supplied projects we deliver to site and stay out of your sequence.
Other sectors we serve

Property Managers & Condos
Bent, rusted or missing bollards? One supplier for the whole portfolio.
View
Warehouses & Industrial
Physical separation between forklifts and people, not just painted lines
View
Retail & Store Fronts
Protect the glazing, the entry and the people: the same way at every location
ViewSend a photo. Get a quote within 24 hours.
Tell us what you are protecting and from what. We will come back with a part number, a price and a date.