Getting it in the ground
Supply only, or supply with coordinated installation
Some buyers have a contractor and just need the right product delivered on the right day. Others want one number and one point of contact. We do both, and we are clear about which one you are buying.

How it works
- 01
Confirm the mounting condition
Concrete, asphalt, pavers or unknown. Slab thickness and condition drive the anchor specification and, often, the price.
- 02
Choose supply-only or coordinated installation
Supply-only ships to your site or your contractor. Coordinated installation is quoted as a single number covering product and the install.
- 03
Confirmed delivery date
Lead time is stated per line on the quote and confirmed in writing. Staged deliveries available for phased or multi-site work.
- 04
Site work and sign-off
Access windows respected: off-hours for retail and distribution centres, summer windows for schools. Photographs on completion.
What is included
- Product supply with confirmed lead times
- Coordinated installation quoted as one number where required
- Staged and phased delivery for multi-site rollouts
- Delivery scheduling around your access and shutdown windows
- Completion photographs for your records
What we do not do
Stated plainly so nothing is assumed. Where a job needs these, we will say so and refer you on rather than quote something we cannot stand behind.
- Stamped or sealed engineering drawings and deep foundation design
- Powered, hydraulic or automatic retractable bollard systems with controls integration
- Civil works, concrete pours and surface reinstatement beyond the mounting itself
What you end up with
Product on site on the day you were told, installed to the mounting specification, with photographs to close the file.
Send a photo. Get a quote within 24 hours.
Tell us what you are protecting and from what. We will come back with a part number, a price and a date.




